Commercial Fabrication

Community Sacco Curtain Wall

A full-height reflective glass curtain wall wrapping the first floor of a working Sacco branch.

Community Sacco Curtain Wall — Commercial Fabrication in Busia

The brief

Overview

The Sacco was adding a first floor above a branch that could not close for a single trading day. We fabricated and installed a reflective glazed curtain wall across the full frontage, working around live banking hours and an active building site below.

The challenge

The branch stayed open throughout. Scaffolding had to clear the public walkway, and the existing concrete beam was out of level by almost 40mm across the span — enough to throw the whole grid out if we had built to nominal dimensions.

What we did

We surveyed the beam and set the aluminium grid off a true datum rather than the concrete, taking up the discrepancy in a packed head channel hidden behind the transom. Glazing was lifted and set outside banking hours over four evenings.

Gallery

On site.

Click any image to view it full size.

More like this

Other commercial fabrication work.

Ready to build something that lasts?

Tell us what you need. We measure, quote and build — and we turn up when we say we will.

Call Us Get a Quote